MikLav Renault 5 Super project
The plan of the project
Home
The plan of the project
The progress of restoration
Photos 1 - The start
Photos 2 - The body work
Photos 3 - After phase 1
Photos 4 - Dashboard
Photos 5 - The Interior
Photos 6 - Dumping the noise
Photos 7 - The Audio System
Photos 8 - The engine
Photos 9 - Wheels-n-brakes
Photos of other R5
Renault 5 related links
Contact Me (MikLav)

The outline of the restoration plan

Part 1. The first priority work that must be done before passing technical control.
  • Replace the left rubber support of the motor (done)
  • The headlights didn't switch on, fixed now.
  • Test the breaks, possibly change the breaking pads (done) 
  • Replace the rubber cover on one of the steering axes (done)
  • Clean the carburetor (done)
  • Tune the carburetor (done)
  • Change the front tyres (done)
  • Change the oil and oil filter (done)
  • Replaced the spark plugs
  • Replace the distributor (done)
  • Replace the air filter (done)

 
Part 2. Important work that is not critical for technical control.
  • Repair the rusty metal patch on the body under the driver's door (done though it is yet to be painted)
  • Clean and repair the rusty spots near the right back wheel (done)
  • Clear the rust on the silencer and protect that place (done)
  • Repair the bampers (rear repaired but yet to be painted, front replaced but to be painted too)
  • Replace the radiator grill
  • Replace the front left turning light (done)
  • Clean the suspension, protect from rust and paint

Part 3. The work of secondary priority.
  • Repair the bumps on the body and capote (done)
  • Repair the shelf in the trunk
  • Repair/change the seats (done)
  • Install electric windows (and mirrors if possible)
  • Install central electric lock

Part 4. Further improvements once the car is usable.
  • Custom painting of the car
  • Modify the dashboard
  • Replace the steering wheel (done)
  • Improve the noise protection
  • Replace the carpet floor (done)
  • Change the door and wall panels (done on 1 side)
  • Install the sound system
  • Improve the lighting and the ventilation of the cabin

If you have any questions please don't hesitate to contact me